The Rosemont Hotel & Residences was one of the most talked-about Dubai designs of 2016: two towers rising from a shared podium, with an artificial beach and a rainforest-style landscape laid out on the podium roof between them. The renderings by ZAS Architects showed sky pools, a sky lobby and a leisure deck of trees, water and shade, high above Sheikh Zayed Road.

The Rosemont Hotel & Residences design
According to the ZAS Architects project page, the Rosemont occupies a site of about 13,000 m² in Al Thanyah First, just off Sheikh Zayed Road. The key figures:
- Towers: two 47-storey towers on a shared five-storey podium, with two basement levels.
- Rooms: a 450-key hotel tower and a 280-key serviced-apartment tower.
- Size: about 170,000 m² of construction area and 106,000 m² of gross floor area, including some 7,000 m² of entertainment space.
- Amenities: sky lobbies and sky pools in both towers, fine dining, a spa, a health club and meeting rooms.
When the project was announced, designboom reported that the hotel would be operated under Hilton's Curio Collection and placed the site opposite Dubai Internet City.


A rainforest on the podium roof
The headline feature was the leisure landscape on top of the podium. Gulf News described it as a 75,000 sq ft rainforest with splash pools, a sand-less beach and a rainforest café, plus adventure trails, play zones, waterfalls, streams and a Jurassic-inspired marsh. A "Rain Room" would use sensors to keep visitors dry while rain fell around them.
The planting plan relied mostly on indigenous trees, shrubs and ground cover. Preetam Panwar, executive director at ZAS and project director for the Rosemont, told the paper the rainforest should run 2 to 3 °C cooler than the surrounding air, comparing it with the green Al Barari community.


Sky pool, sky lobby and leisure spaces
Designboom's report also mentioned a glass-bottomed infinity pool overlooking the Gulf, a splash pool using recycled water and robotic luggage handlers. The renderings show the sky lobby on the 26th floor, an arrival hall with a giant screen displaying marine life or vegetation, and an entertainment line-up that included a trampoline park, spa, cinema and bowling alley.





Planning a stay in Dubai
The project was scheduled for completion in December 2018. Before planning a trip around it, check its current status through the operator's official booking channels. Dubai has plenty of extraordinary hotels already open: browse our unusual hotel guide and these infinity-pool questions for ideas.




0 comments:
Post a Comment